Project Reference
Hazrat Shahjalal International Airport
Implementation from F/S to detailed design for master plan.
In charge of design including advanced automated system and explosion detection system in the cargo terminal buildings and airport firefighting facilities in particular.
-
Fukuoka International Airport,
JapanResponsible for basic design, detail design, and supervision:
- Baggage handling system
- Airport screening system
- Smart security lane
- Passenger boarding bridge
- Docking guidance system
-
New Chitose International Airport Passenger, Japan
Responsible for basic design, detail design and supervision:- Baggage handling system
- In-line explosion detection system
- Smart security lane
- Check-in system
- Flight information system
-
Noi Bai International Airport Terminal 2 Project, Vietnam
Responsible for basic design, detail design, and supervision:
- Baggage handling system
- Airport screening system
- Passenger boarding bridge
- Docking guidance system
- Common use terminal equipment
- Flight information system
-
Tan Son Nhat International Terminal 2 Expansion Project, Vietnam
Responsible for detail design:- Baggage handling system
- Passenger boarding bridge
- Docking guidance system
- Airport security system
- CUTE, FIDS, MIS
-
Phu Bai International Airport Project, Vietnam
Responsible for basic design:
- Baggage handling system
- Airport screening system
- Passenger boarding bridge
- Docking guidance system
- Common use terminal equipment
- Flight information system
-
Cam Ranh International Airport Project, Vietnam
Employer’s adviser for the design:- General layout of terminal
- Passenger process
- Baggage handling system
- Customs process
- Immigration process
-
Narita International Airport, Japan
Responsible for the plan of the facilities relocation of the whole airport including:
- Runway, Taxiway, Terminal Building, Cargo Terminal, Parking, etc
- Passenger process improvement master plan.
- An investigation for passenger process improvement in Terminal Equipment
-
Hanamaki Airport, Japan
Responsible for the extension works of the Hanamaki airport including basic design, detailed design from master plan, and held peripheral duties including cost management and cost/
benefit analysis of runway, taxiway, apron, parking road, building plan, etc
Delhi airport Airport Transport Mode (APM) Feasibility Study, India
Implement F / S for APM introduction that connects T1 to T3 of Delhi airport.
Kansai International Airport Expansion & Renovation, Japan
Provided supervision works
Airport facilities long-term repair and production system project, Japan
Provided design and system production of System production in Airports
The Airports is the system which automatically making long-term repair of Airport Facilities.
Earthquake information project, Japan
Provided basic design of Earthquake information system in MAPS and the detailed design and devised systems construction specifications. The earthquake information system monitors the situation of the earthquake that occurred by Virtual Private Network in navigation AIDS facilities in Japan instantly.
MAPS project, Japan
Provided basic design of machine facility management maintenance system (MAPS) and the detailed design and devised systems construction specifications.
MAPS monitored machine facilities at remote locations throughout Japan via virtual private network. The goal of the system – to realize high performance with low cost – was realized within one year.
Flight checkers hangar choice examination, Japan
Relocation of base of the flight checkers that JCAB owned. The result of the analysis was reflected by a relocation plan.
Basic facilities evaluation standard making of the airport, Japan
Draw up a prediction of PRI (Pavement Refresh Index) which is the repair standard of the apron and a runway, a taxiway evaluate the application…
Pavement structure analysis, Japan
Measure the outbreak stress of planes during take-off and landing at Tokyo International Airport (Haneda), and analyzed the properties of the runway and the behavior of the plane upon contact. The result of the analysis has been incorporated into the specifications of all future runways.
Airport administration program planning, Japan
Analyze business processes for entire airport operations and devised the optimal business processes for newly constructed Shizuoka airport, including staffing plan and job specifications.